Project: Capacity expansion of the An Trach salinity prevention pumping station from 210,000 m³/day to 420,000 m³/day.

Project: Upgrading the capacity of the An Trach salinity control pumping station from 210,000 m³/day to 420,000 m³/day.
Investor: Da Nang Water Supply Joint Stock Company (DAWACO)
Hạng mục: Supply and installation of materials and technological equipment: Ebara pumps; valves and fittings.
AVK valves/fittings; Cummins generators; Sungdo crane girders; electromagnetic flow meters.
ABB electrical equipment; Phuong Linh ventilation fans; …
Investment Capital: More than VND 360 billion
Location: Hoa Tien and Hoa Chau Communes, Hoa Vang District, Da Nang City, Vietnam.
Scale / Capacity:
Increasing the capacity for abstracting non-saline raw water from 210,000 m³/day to 420,000 m³/day.
Main components:
+ Installation of new pumps.
+ Construction of a raw water pipeline with a diameter of 1,200 mm connecting the An Trach pumping station to the Cau Do Water Treatment Plant, with a total length of approximately 7.4 km.
+ Auxiliary works: raw water intake structure, pumping suction system, pipeline system, and connection to the existing network.
Objectives: Enhancing the water pumping station’s treatment capacity to meet the increasing demand, particularly during the dry season or periods of saltwater intrusion.
Significance: Ensuring a safe and sufficient supply of clean water for the city during the summer, especially in the dry months.

Please share the article if you find it interesting!!

General Information: Project Name: FPT Education (FPT Edu) Project Investor: FPT Corporation [...]

General Information: Project Name: Investment in the Construction of the Wastewater Collection System in the Hoa Xuan Area […]

Project Name: Son Thanh Water Treatment Plant – Khanh Hoa Project Owner: Joint Stock Investment Company […]

Project Name: Long Thanh International Airport Location: Long Thanh District, Dong Nai Province, Vietnam

Project Name: Software Park No. 2 Investor: Construction Investment Project Management Board

Project name: Centralized Information Technology Park (Phase 1) Investor: Joint Stock Company […]

Project name: Construction of Hoa Xuan Wastewater Treatment Plant (Phase 3) Investor: Project Management Board […]

Project name: Renovation and construction of the stormwater drainage system in Thanh Khe and Lien […]

Project name: Construction of the wastewater collection pipeline on 2/9 Street (Section from Phan Thanh Tai Street to […]

Project name: Capacity expansion of the An Trach salinity prevention pumping station from 210,000 m³/day to 420,000 m³/day Investor: […]”

Project name: Capacity expansion of Cau Do Water Treatment Plant from 230,000 m³/day to 290,000 m³/day […]

Project name: Hoa Lien Water Treatment Plant – 120,000 m³/day Investor: Construction Investment Project Management Board […]